I was not in the lesson for the second production meeting, however, I have watched the video of what the others have done and I have outlines what I have to do and who I will be working with. Sam, as the director, informed us where we well be working and what we will be working on.
My Jobs;-
;- I will have to create a moodboard, for the lighting, and this is where I have to set up the lights, with and w/out colour gels, and upload images of these to show how the set will look w/different colours.
;- I was told that, like many other people, I would have to produce a risk assemsment form, howing all the risks of the lighting and set, how high a risk they were, and how we would overcome them.
;- I was told that I have the budget, as set designer, and with this, I would choose props. An idea someone had was to get mugs made with the 'Trapstar' logo on it, and this would be a good marketing idea, so I would look into that.
This Week;-
;- One of my jobs this week, would be to create the risk assesment, I have started this as well as creating a birds eye view of the set design w/locations.
;- I would need to work w/the director, the floor manager, and the presenters to work out what is going where, what I will need for the props and talk to the graphics prducer to work out colours, which is where I have started to work with Sam (director) to wok out what is going to be in the show, for example, rate and slate wall, so I have already started to work out where thjat would go.
Next Week;-
;- My Plans for next week will be to create the mood board for the lighting used on th live day, and I will take images of both with and w/out the gel pads, with and w/out the prresenters.
;- I will also finish and upload the set designs plans.